Stock Preparation Machining Welding Assembly Test Shipping
Day 0




Stock Waste
This TurnSo far
0 0

Missed Job
This TurnSo far
0 0
Stock Waste
This TurnSo far
0 0

Missed Job
This TurnSo far
0 0
Stock Waste
This TurnSo far
0 0

Missed Job
This TurnSo far
0 0
Stock Waste
This TurnSo far
0 0

Missed Job
This TurnSo far
0 0
Stock Waste
This TurnSo far
0 0

Missed Job
This TurnSo far
0 0
Sold : 0

Sold so far : 0

Benefits : 0.00 $

Benefits so far : 0.00 $

Welcome to this 'Push-Pull System' simulation.

Please note that this simulation is under construction.
At this moment, only the Push system is available.

This board represent a chain of production. Each worker in each step try to make a maximum of work.